2018-11 todo2018-11-05 2 min read To do2018-11-05 Paper comments to Lin; Cancel the tsumitate; Ask about the insurance; Submit nenmatsu; Modify the poster (adding logo), etc;2018-11-06 Bayesian statistics practical 6 done; Prepare AJCN template (Rmd) file; Prepare AJCN draft (.docx) file; MLCA analyses done stratified by men and women;2018-11-07 fix the racket before Wed. Bayesian statistics Chapter 7 done 20%; Check the problem of the gh-page on github.2018-11-08~11 Search for guideline of eradication among adolescents of H. pylori in the world; Protocol comments to TMS; Read the victim book, and keep memo; Prepare the manuscript for AJCN 10%; Modify the Presentation Slides2018-11-12 Bayesian statistics Chapter 7 done 80%; Read the victim book, and keep memo; Comment the Presentation Slides from LP; Labeling the learning note bookdown book.2018-11-13 Bayesian statistics Chapter 7 done 100%; Prepare the manuscript for AJCN 25%; Comment the manuscript from Lin; Domestic travel paper work2018-11-14 Read the victim book, and keep memo; Prepare the manuscript for AJCN 40%;2018-11-15~16 Bayesian statistics practical 7 done 100%; Prepare the manuscript for AJCN the tables, figures done;2018-11-19 Prepare the manuscript for AJCN 80%; Confirm the feedback of the project;2018-11-20 Comment KS application form (2018-11-21). Perform the analyses using sex as an interaction, combine three tables. done 20% Read the victim book, and keep memo; Bayesian statistics Chapter 8 20% done;2018-11-21 Learn Stan for Bayesian stats 1%; Perform the analyses using sex as an interaction, combine three tables. done; Bayesian statistics Chapter 8 30% done;2018-11-22 Learn Stan for Bayesian stats 5%; Bayesian statistics Chapter 8 35% done; Manuscript to AMU about the overseas study2018-11-24 Learn Stan for Bayesian stats 6%; Review the JAT meta-ana paper (deadline: 2018-11-28);2018-11-25~12-02 (annual leave)To do王 超辰 - Chaochen WangReal World Evidence ScientistAll models are wrong, but some are useful.Please enable JavaScript to view the comments powered by Disqus.comments powered by DisqusRelated2018_10 todoSummer Project ScheduleTodo 2018 June-SeptemberTo do list 2018 May